It's fall of 2007 and Construction has started Again!!!
I hope to show before and after picture as they happen with a brief description.  The latest work is at the top of the page.

3-29-08

Mulch Mulch Mulch -
5 yards of the stuff was added around the house with stone borders


Nancy stopped in a gave us a hand on Saturday.

and more Mulch.....

The old boat  was cleaned up a bit.


Front deck and bench was pressure washed and re-stained.
 

3-8-08

Tile floors are finished and so is the bathroom.  We are ready for opening!

3-1-08

Tiled and repainted guest hallway.  Tile will be grouted next week.

Bathroom shower installed minus soap dish & shelf.

Vanity and sink were placed into position, pluming not installed

2-23-08

Backer board floor was added  to sub-floor


Tile was added to bathroom floor.

Bathroom walls were primed and hallway was painted.

2-16-08


A second new A/C and Heater has been installed.

2-9-08

This is another one of my composition photos, about 9 photos warped into one. 
The photo's are twisted and pieced together but it shows what we are up to. 
The end result will be a large shower with a seat and glass doors.  This weekend
we were able to run the water lines & pressure test them for leaks, connect in the
drains and put up the greenboard.

1-26-08

Bathroom color scheme

Ted & Chris is installing the Pergo flooring

Purple room with flooring and new trim
     
Purple & Yellow rooms floored, trimmed and with furniture.

1-19-08

Yellow room has been repainted from floor to ceiling, It's very bright and tough for the camera to get a true picture.
Chris is sealing the sliding door threshold.


Purple room has been repainted from floor to ceiling, Purple color was brightened a shade or two

Floor trim is being painted for the Yellow and Purple rooms. 
Next weekend will be all about the bedroom flooring


Ted sanding the sliding door's threshold.

After Ted was finished sanding the threshold.

Finally got around to adding some of the trim in the kitchen. 

1-5-08

Yellow room's carpet and wood trim were removed, walls and ceiling cleaned and sanded

Purple room's carpet and wood trim were removed, walls and ceiling cleaned and sanded.  Chris pulled up all those little staples....

We pulled up the blue vinyl floor and found a brown vinyl floor.

We pulled up the brown floor and found a clean sub floor in good shape.

We cut up the old tub and tossed it in the dumpster, removed old flooring.

Did anyone notice that the bathroom door was only 24 inches wide?  We will enlarge it to 30 inches.

We took down the fence between MGH and our neighbor Jim.

Chris is cutting up the oak fence for fire wood

Another dumpster starting to fill up.

 Hummm, That bathroom doorway looks wider!


Added new 5/8" floor over the existing 5/8". 

We think the A/C unit is leaking condensate on to the hall and bathroom floors.  We are having this checked this week.
[It was confirmed that the inside A/C blower unit need to be replaced due to leaking.  That will happen within the month.]

12-24-07

Front deck - new fence and railings

We added a new Ceiling fan in the living room and continue to work on the front fencing. 

We had to cut an opening into the second floor A/C unit so we could pull a wire from the ceiling fan to the breaker box. 
We've made this into an access door incase of future A/C repairs.

12-01-07

Ted making minor trim adjustments



Fence and gate nearing completion.  Gate was moved forward to give more room for the pool.

 

New kitchen furniture arrived - seating for 8 around the table, 5 around the bar.



Kitchen steps and railing completed, deck speaker relocated,.

11-10-07
Kitchen steps and landing are being build wider since people like to site on them.


Front fence is being replaced with a vinyl composite decking material and treated lumber rapped in aluminum.

This is Ted's "Big Root" it had to be removed to run a 2 inch conduit pipe which will contain both deck power and speaker wires.

Remember those lose steps and the water valve in the middle of the deck?  They're both gone.

We had to dig around 4 feet down to remove the valve and stem, finally moving it outside the fence.

It's fall of 2007 and Construction has started Again!!!
I hope to show before and after picture as they happen with a brief description.  The latest work is at the top of the page.

The photos below are from the fall 2005 to spring 2007

Fish eye view of the New Kitchen

5/5/07 outside shower is now all vinyl.

Kitchen cabinets were installed [counter tops & appliances were not delivered?]


4/14/07 New entrance steps & kitchen was painted [no picture of kitchen- it's a surprise!]

Prepping for Starboard opening

3/3/07 - powered up all overhead lights, drywalled and applied the first coat of spackled.


2/24/07 - removed old tile, replaced rotted subfloor, leveled floors and added recessed can light

2/5/07 - Relocated all the Electric lines and added new outlets to the corporate meeting room.

2/5/07 - Knocked down wall between Kitchen and VooDoo lounge

It's nasty under the house!!!!!


 

1/27/07 - started remodeling the Kitchen and Corporate Bed Room


 

12/23/06 - 99% of the siding and windows are finished ! ! ! ! ! !


 

12/9/06 - A bit chilly Saturday morning but we still managed to finish the living room siding and put up the lights.

12/10/06 - Sunday was much warmer.  We ran out of siding around 2pm and finished the day working on the little odd job.

 

We spent the long Thanksgiving weekend siding the west and south side of the house. 
Part of the rear deck was removed so we could install flashing along the house, that will keep the water away.
The rest of the siding work will be very time consuming do to all the cuts.  [no more open areas]


10/21/06 - And still more work.........
We flashed and trimmed Voodoo lounge windows, added the Tyvek and put up more siding. 

10/14/06 - Here are a few photos from this past weekend............ 
We removed the old rotted trim and reinsulated around the door and windows.  Re-trimmed the door and sided the Kitchen.
Siding was removed from the front shed, replaced with treated plywood and sided.  Lights were installed at the front door and kitchen.
VooDoo lounge trim was removed but we ran out of time.

 

9/23/06 - We didn't work on the house all summer. [Maybe that was a good thing!]
Here are a few photos from this past weekend............  Thanks for lending a hand Mike!

 

Memorial day weekend - changes are beginning to take place .

May 21st:  Slow but progress is being made.  [Someone's hang-over didn't help.] Ha Ha Ha!!!!!

April 30th weekend:  Yes! We finally started siding the house.

 

March 31 weekend

Above photo shows how far we got before calling it a weekend.  All the windows were replaced except for the Voodoo lounge, Meeting room and the Blue room.  Two weeks ago we felt the blue room's windows were okay.  After further examination we will replace them.


We also removed a few sections of the fencing along the ocean side of the house.  This really opened the yard up and allows for some needed landscaping.  We reused the old gate for now, but plan to replace it this summer.

  =================================================================================

New Years Weekend - A little work and a lot of play. [as it should be]

December 16-18 2005
Before 
backofhouse.jpg

After:


Ted cut the fronts and bottoms of the rafters to square them up,
Added new wood face and covered it all in aluminum.


Only the front surfaces are being covered at this time.  
We hope to get to the sides in a week or two weather permitting.

November 25-27 2005

landscapingsm.jpg
Before


After - Front of the roof rafters were covered and the underside enclosed with white vinyl.
Below - Ted and Chris installing the white vinyl.