The photos below are from the fall 2005 to
spring 2007
Fish eye view of the New Kitchen

5/5/07 outside shower is now all vinyl.

Kitchen cabinets were installed [counter tops & appliances were not delivered?]

4/14/07 New entrance steps & kitchen was painted [no picture of kitchen- it's
a surprise!]

Prepping for Starboard opening

3/3/07 - powered up all overhead lights, drywalled and applied the first coat
of spackled.

2/24/07 - removed old tile, replaced rotted subfloor, leveled floors and
added recessed can light

2/5/07 - Relocated all the Electric lines and added new outlets to the
corporate meeting room.

2/5/07 - Knocked down wall between Kitchen and VooDoo lounge

It's nasty under the house!!!!!
 


1/27/07 - started remodeling the Kitchen and Corporate Bed Room


12/23/06 - 99% of the siding and windows are finished ! ! ! ! ! !

12/9/06 - A bit chilly Saturday morning but we still managed to finish the
living room siding and put up the lights.

12/10/06 - Sunday was much warmer. We ran out of siding around 2pm and
finished the day working on the little odd job.

We spent the long Thanksgiving weekend siding the west and south side of the
house.
Part of the rear deck was removed so we could install flashing along the house,
that will keep the water away.
The rest of the siding work will be very time consuming do to all the cuts.
[no more open areas]

10/21/06 - And still more work.........
We flashed and trimmed Voodoo lounge windows, added the Tyvek and put up more
siding.
10/14/06 - Here are a few photos from this past weekend............
We removed the old rotted trim and reinsulated around the door and windows.
Re-trimmed the door and sided the Kitchen.
Siding was removed from the front shed, replaced with treated plywood and sided.
Lights were installed at the front door and kitchen.
VooDoo lounge trim was removed but we ran out of time.
9/23/06 - We didn't work on the house all summer. [Maybe that was a good
thing!]
Here are a few photos from this past weekend............ Thanks for
lending a hand Mike!


Memorial day weekend - changes are beginning to take place .

May 21st: Slow but progress is being made. [Someone's hang-over
didn't help.] Ha Ha Ha!!!!!

April 30th weekend: Yes! We finally started siding the house.

March 31 weekend

Above photo shows how far we got before calling it a weekend. All the
windows were replaced except for the Voodoo lounge, Meeting room and the Blue
room. Two weeks ago we felt the blue room's windows were okay. After
further examination we will replace them.

We also removed a few sections of the fencing along the ocean side of the
house. This really opened the yard up and allows for some needed
landscaping. We reused the old gate for now, but plan to replace it this
summer.
=================================================================================
New Years Weekend - A little work and a lot of play. [as it should be]

December 16-18 2005
Before

After:


Ted cut the fronts and bottoms of the rafters to square them up,
Added new wood face and covered it all in aluminum.

Only the front surfaces are being covered at this time.
We hope to get to the sides in a week or two weather permitting.

November 25-27 2005

Before

After - Front of the roof rafters were covered and the underside enclosed with white
vinyl.
Below - Ted and Chris installing the white vinyl.

|